Blog
November 16, 2026
Field notes: the Tuesday a gravel drive showed up across the easementA right-of-way manager's field notes on a gravel drive that crossed the easement unnoticed for weeks, and what that gap in patrol timing costs.
November 16, 2026
Fresh excavation vs. plowed ground: reading ROW imagery rightHow to tell a fresh dig from a plowed field in VHR imagery along a pipeline corridor, so your encroachment log doesn't fill up with tractors.
November 9, 2026
Prioritizing landowner outreach after a right-of-way encroachment flagA practical order for working landowner outreach after a right-of-way encroachment flag, sorted by what's on the ground, not parcel size.
November 9, 2026
Agricultural encroachment vs. normal farming on a pipeline ROWWhere routine plowing and irrigation end and reportable agricultural encroachment begins on a pipeline right-of-way, and what to flag.
November 2, 2026
Field notes: the barn that came back six feet too closeA rebuilt barn drifted six feet into the easement during repair, and the real story is the eleven weeks nobody was looking.
November 2, 2026
Pipeline easement setback distance for new construction: what the rules actually sayThere's no single federal setback number for building near a pipeline. Here's where the real distance comes from and how to find yours.
October 26, 2026
How to write a landowner notification letter for a right-of-way encroachmentA practical guide to drafting an encroachment notice letter for landowners, with what to include and when a letter beats a knock on the door.
October 26, 2026
What counts as a structure encroachment on a pipeline right-of-wayA field guide to what counts as a structure encroachment on a pipeline easement: sheds, fences, pools, and why patrol timing lets them finish unnoticed.
October 19, 2026
Field notes: the fence line that crept six feet before anyone called it inA pasture fence drifted six feet onto a pipeline easement one post at a time. Nobody noticed until the right-of-way survey crew did.
October 19, 2026
How to convert a GPS encroachment find to a milepostA step-by-step on converting a raw GPS encroachment find into a milepost that matches your pipeline alignment and encroachment log.
October 14, 2026
Aerial patrol vs. satellite imagery for pipeline right-of-way monitoringHow foot patrol, aerial patrol, and VHR satellite imagery stack up for catching encroachment between scheduled flyovers on a pipeline corridor.
October 14, 2026
What is a class location change in pipeline integrity management?A plain explainer on class location changes under 49 CFR 192.5, how the unit is measured, and why population creep matters for integrity programs.
October 13, 2026
PHMSA patrol intervals under 49 CFR 195.412: what the rule requiresA plain read of the 49 CFR 195.412 patrol interval for hazardous liquid pipelines, and where the regulatory minimum leaves encroachment risk uncovered.
October 13, 2026
What is a pipeline encroachment agreement, and when do you need oneWhat a pipeline encroachment agreement covers, how it differs from a crossing agreement or permit, and when operators need one.
October 7, 2026
Prioritizing pipeline patrol routes when your crew is short-handedA risk-based way to rank right-of-way patrol routes when field crews can't cover every mile, and how remote flags fit the schedule.
October 7, 2026
Alignment sheet vs. as-built survey: how to read pipeline drawingsHow to read a pipeline centerline alignment sheet against an as-built survey, and why the gap between them matters for ROW encroachment work.
October 7, 2026
Road crossing vs utility crossing: what counts as encroachmentHow road crossing agreements differ from utility crossing permits, and where the line sits between authorized crossings and right-of-way encroachment.
October 7, 2026
What counts as unauthorized excavation near a pipeline?A plain-language breakdown of what regulators and operators mean by unauthorized excavation in a pipeline right-of-way.