Pipeline Encroachment.

Blog

What counts as a structure encroachment on a pipeline right-of-way

A bulldozer grading bare ground on a rural construction site next to trees and hills.

A structure encroachment is any permanent or semi-permanent thing a landowner or third party builds inside the recorded easement width, without the pipeline company's written consent. ROW agents and integrity techs spend most of their working time sorting out this definition in the field, because "structure" covers more than people assume, and landowners rarely check the easement plat before they pour a slab.

What counts

If it's fixed to the ground and sits inside the easement strip, it's a candidate. The ones that show up most on patrol reports:

Excavations and crossings (a new fiber line, a water tap, a farm drainage tile) are a related but separate category. They get caught by one-call tickets more often than by visual inspection, so this list is really about the stuff that goes up without anyone calling first.

Why this gets missed between patrols

Most of these structures don't appear overnight. A shed foundation gets poured, framing goes up over a weekend, and by the time the next scheduled foot or aerial patrol passes that mile marker, it's sided and roofed. The landowner isn't trying to hide anything. They just didn't think a 10x12 storage shed was pipeline business.

The gap is timing, not vigilance. Patrol crews cover a lot of ground on a fixed rotation, and a structure that goes from slab to finished shed in three weeks can sit there for months before the next pass catches it. By then it's a harder conversation: tearing out a finished structure costs the landowner real money and tends to escalate faster than catching a framed slab early would have.

What to do once something's flagged

Once a structure is confirmed inside the easement, the usual path is a landowner contact, a review of whether it violates the specific grant language (some older easements have looser setback terms than current standard agreements), and either a removal request or a documented encroachment agreement if the company decides to permit it with conditions. None of that can start until someone actually knows the structure is there, which is the part that depends on patrol timing.

That's the gap we built this for. Instead of waiting for the next scheduled patrol to pass a given stretch, a mileage-indexed encroachment log flags new structures, excavations, and road or utility crossings inside the corridor from recent imagery, on a biweekly cycle, so a slab or a fresh fence line gets caught while it's still an easy fix instead of a finished building.

If your patrol cycle is the only thing standing between a framed shed and a six-figure relocation problem, it's worth seeing what shows up between your scheduled passes.

Get started

← Back to the blog